In brick machine production process, there always be many small or big questions you may meet inevitably because of wokers different operation level.

I concluded some solutions on those problems, when you check and accept the machine from your supplier, pay attention to these aspects, hope one of them is helpful.

  • In PLC system, cancel concrete mixer original joint connection, you can make it yourselves in machine installation, and it will reduce about $300 cost. Don’t let mixer supplier install the hopper lower limit, and make it when install the machine, too.
  • Make the discharg valve of mixer water scale to be same with cement scale stack valve. Bigger caliber can discharge water fast. The measurement rack should be adjuested before installation when it is in supplier’s factory.
  • Ask the supplier to reinforce pallet holder, so that it can support more pallets.
  • Ask your supplier to make bricks conveyor tracks straight undoubtedly to make sure the lowest disfference between back and forth.

If you need more details, please click here to get professional technique support.